The objective of Action B3 was to perform the full scale dredging and treatment based on all knowledge obtained during the small scale test
The objective of Action B3 was to perform the full-scale demonstration based on the knowledge obtained during the small-scale test. During the full-scale demonstration two dredging robots, Mudsters, were connected to the treatment site and were removing sediments full-time. In this action, the goal was to evaluate if the solution could indeed effectively remove and dewater sediments without disturbing the marine environment.
The results of the full-scale demonstration showed that:
Sediments removed from the bay have been used to cover landfills in the municipality. Also, several pilots were executed to develop innovative ways for use of the sediments.
You can read more about these pilot projects and other studies in the project in the project report.
The success of these pilot studies has led to follow up projects and initiatives, described on this page
Agreement with suppliersThe planning and preparation included all processes of public tendering and purchase of equ
Dredging equipment will be constructed to suit the project purpose and objectives.
To know how to fully use the equipement in full scale, we will first test the system in small scale.
The focus for monitoring and evaluation is mainly to follow up the effects of the dredging activities.
How to disseminate the technology and results of Life SURE.
LIFE SURE will ensure that the solutions developed in the project can be used throughout the EU